Highway Guardrail Repair Pile Driver
Basic feature
With the increase in vehicles on the road, the complex interwoven network of highways is in greater need of meticulous daily maintenance for timely and efficient results. At present, the traditional guardrail repair pile driver (guardrail repair truck) can no longer meet the high standards and strict requirements of the highway. To carry out more efficient and timely guardrail maintenance ,we attach an integral gear head drilling mechanism. Aoheng Machinery’s brand new generation of guardrail repair pile driver has been iteratively innovated and emerged in response to the times, making a stunning debut.
FOB Price 38700/44900(With drill rig) USD/Set(Negotiable)
Truck Pile Driver For Highway Guardrail Repair
FOTON brand Railing urgent repair truck(Pile driver on truck mod)
Technical performance parameters
| No. | Project item | Parameter value | Project item | Parameter value |
| 1 | Maximum permissible gross mass | 7360kg | Gross Vehicle Weight | 6100kg |
| 2 | Pile driving height | 700~2800mm | Load mass | 770kg |
| 3 | Drilling depth | 1500mm | Hole diameter | 100~180mm |
| 4 | Maximum speed of travel | 95km/h | working air pressure | 1MPa |
| 5 | Minimum ground clearance of vehicle body | 180 mm | Minimum turning diameter | 14.5m |
| 6 | Tyre specifications and codes | 7.00R16LT14PR | Engine rated power | 96kw |
| 7 | Standard of exhaust emission | National VI emission standard | side guide extension distance | ≧550mm |
| 8 | Left and right rotation angle | ~270 Degree | Uplift force (vibration) | ≧25ton |
| 9 | Outer dimensions | 6405x2000x2800 | Pile driving or uplift distance | ≧2000mm |
| 10 | Chassis FOTON brand | BJ1076VEADA-51 | Cab crew | 6 people |
| 11 | Hydraulic system pressure | 16MPa | Hydraulic system flow rate | ≧90L/min |
| 12 | Impact frequency | 8~15HZ | ||
| The PTO is equipped with an electric control clutch, which is convenient, quick and reliable to separate or engage. The upper pile driver uses a remote electric control throttle, which can control the engine speed of the main vehicle during engineering operation, so it can precisely control the piling. | ||||
| I.Standard configuration
The machine is equipped with a full set of drilling equipment and accessories. It can directly carry out pile driving, pile pulling out and drilling operations. The machine also adopts advanced hydraulic impact drilling technology (with 6 Chinese patents obtained), which can crush and drill holes in rocks and cement roads. This is something that similar manufacturers’ current general installation auger cannot accomplish. The volume is reduced and the weight is significantly lighter due to the use of advanced drilling technology. Flexible operation, energy-saving and environmentally friendly. You can use the robotic arm to install the drill rod. Convenient, fast, labor-saving and safe. II.Optional accessory
|
||||
highway guardrail maintenance truck multi-functional (I)
Insert a conical expansion sleeve into the pipe and use the reverse thrust to pull the pile upwards.
multi-functional (II)
Impact the pile with a hydraulic hammer (hidden inside the integral rammer).
multi-functional (III)
Drilling (when working, rotating, impact, blowing in coordination).
multi-functional (V)
To ensure maintenance quality, hydraulic outriggers are added. Roller type is suitable for flat roads, and disc type is used for rough roads












